- Engine Plant - Demonstrated a 35 to 0.8
scrap rate reduction and a 45% increase in overall efficiencies
- European Plastic Injection Molding - Reduced
costs to generate $520,600 in annual savings
- Liquid Packaging Lines - Enjoyed a 600% reduction
in changeover and recovery time
- Paint Facility - Achieved a $95,000 decrease
in scrap and $547,000 in direct overhead savings while doubling
production volume
- Detergent Packaging Lines - Made step-change
to a 40% improvement in Overall
Equipment Effectiveness (OEE)
- Case Palletizer - Improved to effect a 25%
increase in capacity
- Liquid Perfume Process - Achieved a 625%
reduction in changeover and recovery time
- Air Compressor - Improved efficiency
to net $110,000 savings in electricity and $250,000 in capital
cost avoidance
|
| |
|