Process Improvement

  • Engine Plant - Demonstrated a 35 to 0.8 scrap rate reduction and a 45% increase in overall efficiencies
  • European Plastic Injection Molding - Reduced costs to generate $520,600 in annual savings
  • Liquid Packaging Lines - Enjoyed a 600% reduction in changeover and recovery time
  • Paint Facility - Achieved a $95,000 decrease in scrap and $547,000 in direct overhead savings while doubling production volume
  • Detergent Packaging Lines - Made step-change to a 40% improvement in Overall Equipment Effectiveness (OEE)
  • Case Palletizer - Improved to effect a 25% increase in capacity
  • Liquid Perfume Process - Achieved a 625% reduction in changeover and recovery time
  • Air Compressor - Improved efficiency to net $110,000 savings in electricity and $250,000 in capital cost avoidance